Mathematical calculation of the optimal time to achieve operating parameters according to WCR when dosing corrective reagents into a double-circuit waste heat boiler with a parallel feedwater supply scheme

A E Verkhovsky1 , K G Gadzhiev1 , A A Gusiletov2 , and E A Verkhovskaya2

1 Federal State Budgetary Educational Institution of Higher Education "NRU" MPEI", 14, Krasnokazarmennaya street, Moscow, 111250, Russia

2 Federal State Budgetary Educational Institution of Higher Education "MAI" (NRU), 4, Volokolamskoe shosse, Moscow, 125993, Russia

Abstract

This article discusses the issues of estimating the time to achieve the normalized WCR indicators when dosing corrective reagents into a two-loop waste heat boiler, with a parallel scheme for supplying feed water to the circulation circuits. Calculations of the optimal time required to reach the regime parameters of the WCR when dosing amine-containing reagents are given. The article also provides calculations of the optimal time to reach the WCR regime parameters, depending on the feed water flow rate in each of the waste heat boiler circulation circuits.